Ravens and a FlowerFour four-inch tiles. The ravens are done with a two part glaze process where I apply a strontium carbonate based glaze underneath one of my usual glazes. It gives the top glaze a reduction fired look, or a variegated matte/semimatte surface. The flower has a single glaze but it was underfired to give it a matte surface and is not as variegated as the double application. The double glaze process takes more time so the tiles are priced at $40 whereas the single glaze process is $35 per tile.
The tile business is always slow at the beginning of the year and then gets unbelievably busy by about mid June. I participated in a local show here in Anchorage last weekend but didn’t sell a single tile. My main customer is the visitor to Alaska that is looking for something made by an Alaskan Native, with local materials, and with traditional themes, motifs, and stories. And they don’t show up until after break-up (When the snow piles finally melt away). I should be thankful that I have a niche.
Plant Impressions
Went to the Denver March Powwow to sell art tiles the end of last month. The economy is still soft and I didn’t sell enough to cover all the expenses, but I did get to see my Dad, brother, and sister. They still live there, and three of my other siblings and I have moved back to and now live in Alaska. I have never seen so many dancers and drum groups. There were a lot of vendors. My favorite were the Navajo rug weavers, wish I could afford one of their hand woven rugs.
Scooted over to San Francisco to attend the Southern Graphics Print conference. I have a Bachelor of Arts in Printmaking, so it was a professional thing. It sure is nice to go to the demos and workshops. And you couldn’t ask for a nicer city to have it in. I love cities where you can walk around.
The plant impressions did ok. I know they will do really well in Chicago when I go to an arts and crafts show at the Chicago Botanic Garden in July. Van Briggle Tile Factory
While in Denver, I took a road trip to visit the Van Briggle Tile company and learned that it had gone out of business do to the recession. It was sold last year but the buyer isn’t producing tile. The picture is of their original factory that had the kilns built right into the building. Bummer. It would have been my third visit to the factory. My first time was when it was in a horseshoe shaped building that had been a train switch building. You could walk through and see the various stages of tile making. The second trip was four years ago when they had moved in a smaller space. I should have suspected times were tough because everything was covered in dust.